AluMachinery

Vertical powder coating line for aluminium profiles

Price from-to, depending on configuration

350,000-700,000 EUR (EXW)

Price depends on configuration. Informational only (Art. 71 Polish Civil Code), not a binding offer. Verified: 2026-07-17.

Vertical powder coating line (800-1200 t/month)
illustrative visualisation
Vertical powder coating line (800-1200 t/month)

The vertical line is the top league of profile powder coating: 6-metre profiles hang vertically and pass through booths that coat them all round, eliminating re-hanging and giving a perfectly even film on every face. Output reaches 800-1200 tonnes per month (50-80 t/day) with only 2-3 operators.

The scope covers the tower conveyor, surface pre-treatment, booths with automatic colour change and ≥98% powder recovery, the curing oven and supervisory control. Film thickness tolerance is ±5 μm. The line takes one-third to one-half of a horizontal line's floor space, but needs an 8.5-9 m tall building.

This is a project-class investment, not an off-the-shelf product, so we start from your building and colour mix, and finish with a layout design and an installation schedule with the manufacturer's crew.

Specification

Output800-1200 t/month (50-80 t/day)
Powder recovery≥98%, application >85%
Film tolerance±5 μm
Crew2-3 operators
Required hall height8.5-9 m
Footprint1/3-1/2 of a horizontal line

CE status

CE: machine requires EU conformity work, we arrange a compliance quote

How we work

Transaction terms

  • Production lead time: 16-24 wks

Applications

High-volume coating of architectural profiles: window, facade and fencing systems, especially with frequent colour changes.

Who it is for

Extruders and coating job-shops planning a capacity jump above 500 t/month; plants running out of space for a horizontal line.

FAQ

Vertical or horizontal?

Vertical wins at high volumes and frequent colour changes; horizontal at smaller scale, low buildings and unusual profiles. Send your hall dimensions and production plan, and we will price both options.

Ask about this machine

Engineer replies within 24h (business days)

Related